For EHV Transformer 1. Take oil sample for BDV Testing every year. BDV should be greater than 80 kV in 2.5 mm gap. (Oil sample should be taken in Dry season. probably form Nov. to Feb.) 2. If BDV is less than 80 kV then replace the oil of diverter switch and also clean n flush the diverter switch. (without racking out from Main Tank) 3. Even if BDV is greater than 80kV replace the oil biannually invariably. Also clean n flush the diverter switch. (without racking out from Main Tank) 4. If any abnormal test results found in winding resistance test then overhauling of Diverter switch by Racking out / Dismantling /reassembling to find out the detail root cause of variation in test result. 5. While carrying out work Gear Box of Horizontal Lever to be attended for oiling greasing. 6. Check for working of heaters in OLTC control Box 7. Check for vermin proofing of OLTC control Box. 8. Check for OLTC Operation Remote/Local Electrical & mechanical. 9. Check for simultaneous operation of al...
Read and Learn electrical engineering online